Titan of Ti

Initiation of Coverage  ·  Equity Research Australia  ·  Materials
Initiation of Coverage  ·  5 October 2026
McLaren Minerals Limited
ASX:MML  ·  Materials
Titan of Ti

McLaren Minerals Limited (ASX:MML) is an Australian mineral exploration and development company with two projects.

The McLaren project, one of the world's largest undeveloped titanium-rich mineral sands deposits, is a large heavy mineral sands development. It has advanced from a successful PFS and is now in a BFS. With the BFS underway, production could start in the latter part of 2028 if all goes according to plan.

The Barossa Project in South Australia's Eucla Basin is an approximately 50-kilometre-long, zircon-rich heavy mineral sands system with potential for rare earth elements. Acquired from Iluka Resources, this is an early-stage asset.

Asset Scale & Grade

  • Globally Significant Deposit: The core McLaren Titanium Project in Western Australia’s Eucla Basin hosts a JORC-compliant resource of 529Mt @ 4.5% Heavy Minerals (HM) containing 23.7Mt of in-situ HM.
  • High-Grade Mineralisation: Heavy mineral assemblages consist primarily of titanium-rich ilmenite, alongside rutile, leucoxene, and zircon.
  • Exploration Upside: The current drilling program has consistently intersected high-grade zones from surface (e.g., 24m @ 7.54% HM) exceeding existing resource average grades. Over 60% of the Mineral Resource remains outside the initial mining inventory used in the PFS.

Strong Economics

  • PFS Economics: The completed Pre-Feasibility Study (PFS) points to compelling project economics, featuring an IRR of 26% in the pre-tax base case and a rapid payback period of 3.7 years.
  • Long Mine Life: The initial conceptual mining case outlines 185.7Mt @ 5.85% HM, supporting a 15.9-year initial mine life.
  • Path to Development: Currently advancing through a Bankable Feasibility Study (BFS) with further geological and metallurgical optimisation underway.

Project Pipeline & Critical Mineral Exposure

  • Barossa Project Expansion: Early-stage project acquired from Iluka Resources across a 50km zircon-rich heavy mineral system with rare earth element (monazite) upside. (Transfer of the tenements is awaiting regulatory approval)
A$0.11
DCF
Current price
A$0.012
Q2 2027Completion of the Bankable Feasibility Study (BFS) for the McLaren Titanium Project with the potential for a larger-scale project – The PFS currently supports a 15.9-year mine life, with a pre-tax NPV8 of A$252m and 26% IRR. Importantly, this is based on only part of the overall resource.
CY 2027Signing offtake agreements and reaching a final investment decision (FID).
Q4 2026Final regulatory approval for the transfer of tenements relating to the Barossa Project acquisition.